Winston-Salem, NC · Tier III · Carrier-neutral

Tier III bank data center expanding to 19MW Critical Load AI facility

470,000 square feet in downtown Winston-Salem, fed by 5 utility feeds from 3 substations, with a sixth in Q3 2027.
Fiber from 5 providers. 4.05 MW critical load available in Q1 2027, 9.25 MW in Q3 2027,
followed by 19 MW and 30+ MW upgrades in 2028 and beyond.

Aerial view of the West End Data Center and Annex in downtown Winston-Salem, with twelve lettered points of interest marked across both buildings
Looking north — 801 W 4th St & 809 4½ St W, Winston-Salem NC
Photographed 2026 · E & H under construction
< 4 ms
to Ashburn
< 3 ms
to Atlanta
< 3 ms
to Raleigh
2 vaults
diverse fiber entry
5 carriers
in the meet-me room

Phased buildout · cumulative IT load

Capacity you can schedule against.

Q1 2027 · Phase I
4.05MW IT
Q3 2027 · Phase II
9.25MW IT
Q2 2028 · Phase III
19MW IT
2029 · Phase IV
30+MW IT
Live firstNew UPS #3 and battery storage on the existing feeds, generators and chiller plant.
Utility
20.6 MW
Generation
15.6 MW
IT cooling
8.8 MW air
Liquid coolingSixth utility feed, four new 3 MW generators, UPS #4–#8, and four Trane chillers for 65°F in-row liquid cooling.
Utility
23.2 MW
Generation
27.6 MW
IT cooling
14.5 MW
+14 MWNew Duke Energy feed at Buxton (24 kV, letter agreement, service by April 30, 2028), four more 3 MW generators, nine new 1,250 kW UPS and five more liquid-cooling chillers.
Utility
37.2 MW
Generation
39.6 MW
IT cooling
24.1 MW
Transmission90 MW transmission request granted; GIS substation design and engineering studies pending, with capacity estimated for 2029–2030.
Utility
90 MW in study

Capacities are cumulative. Phase dates are planning estimates, subject to change, and not a commitment to any delivery or service-commencement date. Phase III long-lead procurement orders are not yet placed. Phased capacity diagram (PDF, Oct 22, 2026)

Why this building

Q1 2027 availability with long-term growth.

20MW and growing

5 utility feeds from 3 substations today, a sixth in Q3 2027 and a seventh by April 2028. Distributed-redundant UPS with N+1 generation. 9 generators (15.6 MW) in place, with first 4 of 10 more being installed in 2027. 90 MW additional transmission study submitted Jan 2027.

Delivered today
20,641 kW
Planned delivery
37,216 kW
Engineering study
125,000 kW
Duke average rate
7.21–7.24¢ / kWh

Eye towards AI density

3,570 tons of air-cooled chillers serve CRAH today, and new redundant chilled-water loops for AI workloads are being installed. First four 545.6-ton Trane chillers dedicated to 65°F in-row liquid cooling online Q3 2027, five more in 2028. CRAH is N+2; pumps and chillers N+1.

Per cabinet
10 → 35 → 50 → 100+ kW
Chiller plant
N+1
CRAH units
30+
Raised floor
18–24 in

Room for expansion

365,000 SF open conditioned office and storage in main building for staging, spares, secure build rooms, or new white space. Annex offers a 90,000 SF footprint for immediate use, or a base for multi-story additions.

Total area
470,000 SF
Conditioned spare
365,000 SF
Floors
5 + 2 sub
Clear height
12–15 ft

Inside the building

Brick exterior of the West End Center main building seen from street level
West End CenterMain building on 4½ St W
Three roll-up loading bay doors on the southwest corner of the main building
Internal loading baysThree bays on the southwest corner
Lobby security turnstiles in the main building requiring displayed access credentials
Tier III securityCredentialed access at Level 1
Street-level front elevation of the Annex, with its glazed central entrance bay on West 4th Street
The AnnexMain entrance at 801 W 4th St
Annex entrance lobby with two revolving security doors and optical turnstiles
Inside the AnnexRevolving security doors and turnstiles
Brick office and conference block on the Annex second level, with a canopied glazed entrance opening onto the deck
Annex offices and conference roomsSecond level, entered from the deck
Contained hot aisle between two cabinet rows, with a sealed roof and glass end doors
Hot-aisle containmentSealed roof and end doors on the cabinet rows
Open raised-floor data hall with lettered grid references and CRAH units around the perimeter
70,000+ SF of white spaceRaised floor with CRAH units on the perimeter
Long row of cabinets running the length of a data hall
Liquid-cooling upgradesExisting rows staged for high-density conversion
Caterpillar diesel generator set installed inside a walk-in enclosure
Diesel generatorCAT set inside its enclosure
Russelectric paralleling switchgear lineup in the generator control room
Paralleling switchgearRusselectric controls at the generator plant
Two 17,000 gallon diesel service tanks under a screened enclosure
Fuel service tanksTwo 17,000 gallon tanks, 34,000 total
Eaton main switchgear assembly fed from Transformer 1 at 480 volts
Main switchgear480 V distribution fed from Transformer 1
Row of metal-clad switchgear sections in the main electrical room
Distribution lineupSwitchgear in the main electrical room
Row of Vertiv UPS modules facing their output switchgear
UPS galleryVertiv modules alongside output switchgear
Large UPS cabinets installed in a distributed-redundant arrangement
UPS modulesDistributed-redundant configuration
UPS distribution breakers and maintenance bypass section
UPS distributionBreakers and maintenance bypass
Rows of C and D battery strings on racks in the battery room
Battery plantC&D strings on monitored racks
Numbered Trane air-cooled chillers on the roof deck walkway
Air-cooled chillersTrane units on the roof deck
Trane CenTraVac water-cooled chiller in the central mechanical plant
Water-cooled chillerTrane CenTraVac in the main plant
Chilled water pumps and welded steel headers in the plant room
Chilled water pumpsPumps and headers in the plant room
Chilled water distribution piping running the length of the mechanical gallery
Mechanical galleryChilled water distribution

Specifications

Detailed specifications

Download PDF
Utility service20.641 MW today from five feeds and three substations:
18.516 MW from four 12 kV lines (Buxton 2 × 5.508 MW, Hinshaw 2 × 3.750 MW).
2.125 MW from a 480 V Winston feed.
2.575 MW from a new 480 V Winston line in Q3 2027 (23.216 MW total).
14 MW from a new 24 kV Buxton feed under a Duke Energy letter agreement, with service on or about April 30, 2028 (37.216 MW total; Buxton reaches 25.016 MW).
RedundancyDistributed-redundant UPS: 3N/2 through Phase I, 4N/3 from Phase II.
2N PDU, N+1 generation.
Five power feeds from three substations, six from Q3 2027, seven from April 2028.
Concurrency and failover throughout.
UPSVertiv distributed-redundant units, 675 kW minimum module.
2.7 MW IT today (UPS #1 + #2, 6 × 750 kVA / 675 kW).
4.05 MW Q1 2027 with UPS #3 (3 × 750 kW, 3-string BESS).
9.25 MW Q3 2027 with UPS #4–#8 (3 × 750 kW and 4 × 1,250 kW).
19 MW Q2 2028 with nine new 1,250 kW UPS (5-string BESS).
BatteryVLA and lithium with continuous monitoring. 10–15 minutes at full load.
GeneratorsNine diesel units, 15.6 MW at N+1 today: 4 × 1.25 MW, 2 × 1.8 MW, 2 × 2.25 MW, 1 × 2.5 MW.
4 × 3 MW online in new 10-generator building with paralleling gear Q3 2027 (27.6 MW).
4 × 3 MW more Q2 2028 with additional paralleling gear (39.6 MW).
Fuel39,000+ gallons of diesel on site with dual tanker offloading / bulk intake lines.
6″ natural gas line.
Energy costDuke Energy average rate by load:
10 MW: 7.24¢ per kWh.
15 MW: 7.22¢ per kWh.
18.5 MW: 7.21¢ per kWh.
Rates include applicable sales tax and assume DSM/EE Rider opt-out.

The site

Two blocks downtown.

Two connected buildings on West 4th Street, running as a Tier III data center, with expansion potential up to 125 MW.

  • Two blocks at 801 W 4th St and 809 4½ St W
  • Duke Energy service via redundant lines from 3 substations
  • Loading docks and freight access sized for industrial data center infrastructure equipment
  • Approved data center zoning and community appreciation of recent enhancements.
  • No height limits for potential greenfield expansion at the 801 W 4th St Annex