Winston-Salem, NC · Tier III · Carrier-neutral

Tier III bank data center expanding to 125MW AI facility

470,000 square feet in downtown Winston-Salem, fed by 6 circuits from 3 substations.
Fiber from 5 providers. 4 MW critical load available in Q1 2027, 9.25 MW in Q3 2027,
followed by 18.5 MW and 30+ MW upgrades in 2028 and beyond.

Aerial view of the West End Data Center and Annex in downtown Winston-Salem, with twelve lettered points of interest marked across both buildings
Looking north — 801 W 4th St & 809 4½ St W, Winston-Salem NC
Photographed 2026 · E & H under construction
< 4 ms
to Ashburn
< 3 ms
to Atlanta
< 3 ms
to Raleigh
2 vaults
diverse fiber entry
5 carriers
in the meet-me room

Phased buildout · cumulative IT load

Capacity you can schedule against.

Q1 2027 · Phase I
4MW IT
Q3 2027 · Phase II
9.25MW IT
Q2 2028 · Phase III
18.5MW IT
2029 · Phase IV
30+MW IT
Live firstFirst halls energized on service already delivered to the building.
UPS completeAdditional generators, switches, and UPS systems installed to increase critical IT load capacity.
+13 MWNew Duke Energy capacity lands, following 2.575 MW 480 V feed and 13 MW 24 kV feeds added in Q2 2027.
TransmissionAdditional transmission capacity in study for 2029–2030. Generator plant expands toward 40 MW.

Why this building

Q1 2027 availability with long-term growth.

The power is already here

Six utility feeds from diverse Duke Energy substations, 2N through UPS and PDU with N+1 generation. Nine generators in place, with first four of ten more being installed in 2027.

Utility feeds
25 MW
Delivered today
20,641 kW
Planned delivery
36,216 kW
Duke average rate
$0.0663 / kWh

Eye towards AI density

A chilled-water coil loop is available for AI workloads, with four 550-ton chillers dedicated to 65°F in-row cooling. CRAH is N+2 on every floor, pumps and chillers N+1.

Per cabinet
50+ kW
Chiller plant
N+2
CRAH units
30+
Raised floor
18–24 in

Room for expansion

Beyond the data halls sits 365,000 square feet of conditioned office and storage already inside the envelope — staging, spares, secure build rooms, or your own operations floor.

Total area
470,000 SF
Conditioned spare
365,000 SF
Floors
5 + 2 sub
Clear height
12–15 ft

Inside the building

Brick exterior of the West End Center main building seen from street level
West End CenterMain building on 4½ St W
Three roll-up loading bay doors on the southwest corner of the main building
Internal loading baysThree bays on the southwest corner
Lobby security turnstiles in the main building requiring displayed access credentials
Tier III securityCredentialed access at Level 1
Street-level front elevation of the Annex, with its glazed central entrance bay on West 4th Street
The AnnexMain entrance at 801 W 4th St
Annex entrance lobby with two revolving security doors and optical turnstiles
Inside the AnnexRevolving security doors and turnstiles
Brick office and conference block on the Annex second level, with a canopied glazed entrance opening onto the deck
Annex offices and conference roomsSecond level, entered from the deck
Contained hot aisle between two cabinet rows, with a sealed roof and glass end doors
Hot-aisle containmentSealed roof and end doors on the cabinet rows
Open raised-floor data hall with lettered grid references and CRAH units around the perimeter
70,000+ SF of white spaceRaised floor with CRAH units on the perimeter
Long row of cabinets running the length of a data hall
Liquid-cooling upgradesExisting rows staged for high-density conversion
Caterpillar diesel generator set installed inside a walk-in enclosure
Diesel generatorCAT set inside its enclosure
Russelectric paralleling switchgear lineup in the generator control room
Paralleling switchgearRusselectric controls at the generator plant
Two 17,000 gallon diesel service tanks under a screened enclosure
Fuel service tanksTwo 17,000 gallon tanks, 34,000 total
Eaton main switchgear assembly fed from Transformer 1 at 480 volts
Main switchgear480 V distribution fed from Transformer 1
Row of metal-clad switchgear sections in the main electrical room
Distribution lineupSwitchgear in the main electrical room
Row of Vertiv UPS modules facing their output switchgear
UPS galleryVertiv modules alongside output switchgear
Large UPS cabinets installed in a distributed-redundant arrangement
UPS modulesDistributed-redundant configuration
UPS distribution breakers and maintenance bypass section
UPS distributionBreakers and maintenance bypass
Rows of C and D battery strings on racks in the battery room
Battery plantC&D strings on monitored racks
Numbered Trane air-cooled chillers on the roof deck walkway
Air-cooled chillersTrane units on the roof deck
Trane CenTraVac water-cooled chiller in the central mechanical plant
Water-cooled chillerTrane CenTraVac in the main plant
Chilled water pumps and welded steel headers in the plant room
Chilled water pumpsPumps and headers in the plant room
Chilled water distribution piping running the length of the mechanical gallery
Mechanical galleryChilled water distribution

Specifications

Detailed specifications

Download PDF
Utility service18.416 MW from four 12 kV lines from two substations.
2.125 MW from a 480 V feed from a third substation.
2.575 MW from a new 480 V line in Q1 2027.
13 MW from new 24 kV feeds to be added mid 2027.
Redundancy2N UPS and PDU, N+1 generation.
Six separate power feeds from three substations.
Concurrency and failover throughout.
UPS15 Vertiv distributed-redundant units, 675 kW minimum module.
9.25 MW IT support in Q2 2027, with 20 MW IT support Q1 2028.
BatteryVLA and lithium with continuous monitoring. 10–15 minutes at full load.
GeneratorsCurrently 4 × 1.00 MW, 2 × 1.5 MW, 2 × 2.25 MW, 1 × 2.5 MW.
4 × 3 MW online in new 10-generator building Q3 2027.
FuelMore than 38,700 gallons of diesel on site.
6″ natural gas line.
Energy costDuke Energy average rate $0.0663 per kWh.

The site

Two blocks downtown.

Two connected buildings on West 4th Street, running as a Tier III data center, with expansion potential up to 125 MW.

  • Two blocks at 801 W 4th St and 809 4½ St W
  • Duke Energy service via redundant lines from 3 substations
  • Loading docks and freight access sized for industrial data center infrastructure equipment
  • Approved data center zoning and community appreciation of recent enhancements.
  • No height limits for potential greenfield expansion at the 801 W 4th St Annex
The Annex rooftop parking deck with mechanical plant along its north edge and the West End Center main building rising behind it
Annex rooftop deck, looking north to the main building